The 13th day was another short work day, but a significant one. The island was installed as were the dishwasher, refrigerator and the ovens. “Installed” is a strong word, perhaps “placed” is better suited. Yes, let me reprhase: The dishwasher, refrigerator and ovens were placed. The fridge is powered and connected. The water line for the ice maker is connected and we have //drum roll// ice.





