Day number nine brought the cabinet guys.  They spent the day becoming acquainted with the puzzle pieces they’d need to put together to form what will become our kitchen.  A couple boxes opened yielded our beautiful nutmeg stained cherry cabinetry.  Anxiety and excitement levels are definitely increasing.

Day nine brought back the electrician for odds and ends, including running that big black cable through our basement to the electrical panel.  Not yet connected, but it’s all ready to go.

Late in the day, the drywallers returned to spackle and spackle and spackle.  These guys start late and work late.

Day 10’s highlight was the very first cabinets installed.  Mark this milestone.  The doors open (and close softly), the drawers open (and close softly).  They’re tall, nearly to the ceiling.

One of the drywallers came back and worked late into the evening spackling, spackling and spackling.  This guy is good.  I think he would have patched every dent, crack and hole anywhere in the house if we needed him to do so.

Day 11 ended with more base cabinets installed, the plumbing capped off, a gas line moved and our old fridge moved once again.

The ovens, microwave and fridge wall.

The butler’s pantry base.

Our poor old fridge must feel very displaced

 

The cooktop and sink base cabinets

 