The 13th day was another short work day, but a significant one.  The island was installed as were the dishwasher, refrigerator and the ovens.  “Installed” is a strong word, perhaps “placed” is better suited.  Yes, let me reprhase:  The dishwasher, refrigerator and ovens were placed.  The fridge is powered and connected.  The water line for the ice maker is connected and we have //drum roll// ice.

  

Kitchen Sink penninsula (with unpaneled dishwasher)

Fridge and ovens! Microwave belongs in the hole

Cavernous fridge! Looks can be deceiving

Charcoal-black island with "sand through"

Backside of island

Fridge - full frontal

 

    
A Kitchen Remodel is based on WordPress platform, RSS tech , RSS comments design by Gx3.