On the twelfth day of construction, we were given the installation of the rest of the base cabinets, excluding the island.  Our appliances were brought into the kitchen from the garage by appliance guys.

The list of what is left to do is a mixture of a bunch of little things and some pretty major ones, too.  On the big items list we have yet to pick the granite and have it installed, the island needs to be installed, the appliances need to be installed, all of the uppers need to go in, the hood and dishwasher, the main sink and faucet, the new sink and plumbing, the garbage disposal, the water filter, … wow, this was a bigger list than I thought.

On the little things list … surely longer than the big things list.  On it:  about a million little finishing touches to the cabinets, the new high hats, the island lighting, the vent covers, the in cabinet and under cabinet lighting, the tile replaced in the pantry, the light over the table portion of the island, the drywall on the back of the half-wall, the glass in the cabinets doors, the low voltage transformers, the hood vent …. yes, another long list.

Oh, and painting.

On to today’s pics:

The sink bases

 

The window seat (center drawer holds hanging files)

 

Our half-wall bookcase replacement

 

The bottom of our new hutch

 

New appliances just waiting …

 

Yet another new home for the old fridge

 

    